Factory Tour

Quality Control Process

There are 6 normal steps for QC control process:

Step 1: all materials passed 100% IQC inspect

Before send materials to workshop and start to produce, our IQC technicians will inspect them.

And only the materials are approved to send to workshop if they are qualified.

Step 2: at least 48 hours aging test before packing

All unit lights will be 100% QC inspect and takes around 48- 72 hours aging test

Step 3: hang testing 

Each batch production we will select certain percent to do hang or rotating test.

Step 4 : Environment high temperature testing

we did two parts test for high temperature testing :

A: testing during the product still in R & D

B: testing for each batch production 

Usually we test the temperature reach to around 45℃.

Step 5 : vibration test--simulating transit environment

each batch production we will select certain percent to test to make sure the goods is safe in transport

Step 6: waterproof testing

all waterproof lights we will do waterproof test to see can it be work fine under rain

Certificate

All of our products are passed CE, RoHS certification,and we have more than 20 patents in China

certification 1200

2021 Guangzhou Get show professional lighting exhibition

2021 Get show in factory tour

2020 parties product appication on shows