1940ZH-19x40W Led Wash Moving Head 4-in-1 RGBW Led

Short Description:

1940ZH-19x40W led wash moving head 4-in-1 RGBW led,updated from 19x40w bee eye moving head, removed the function of bee eye, keep advantage of high bright, aesthetic appearance and small size & lightweight. 1940ZH is a powerful Led wash light can meet demends for mostly shows. It is even able to spot on 70M distance  on narrow beam 6.5°. Head make 3 ring led effect, good dimming curve with flicker free, fan work speed auto adjustment with head temperature. Quitely stable performance and good color mixing ability make it to be mostly people’s choice.


  • Certification: CE, RoHS
  • Warranty: 2 years
  • MOQ: 1 piece
  • Product Detail

    19*40w zoom wash

    Technical Parameters

    Optics Pan/Tilt
    Led source 19*40W rgbw 4in1 Led Pan/Tilt Resolution 8/16 bit
    Beam angle 6°- 45° Pan 540°
    Power Consumption 630W Tilt 270°
    Control Construction
    Control Modes DMX512/Mater-Slave/Auto Run/Music/RDM Display 180° reversible 1.8-inch TFT color display
    DMX mode 19/27 Channels Data In/Out socket  3-pin & 5-pin XRL socket
    Features Power Socket PowerCon in/out
    LED 3 ring effect Protection Rating IP20
    0-100% smooth dimming Specification
    High-efficiency optical system Dimension 376x280x418.5 mm; NW: 16.5 kgs
    3-Phase motors,fast,quiet operation and flicker free Standard package:carton;Flight case in optional
    Fan work speed auto adjustable with head temperature Certification
    Folding hooks installed CE,ROHS

    LUX Date

    Product Effect

    Product Technology Details

    4019 1
    4019 2

    FAQ

    Q:Do your products have any QC before sent?

    RE: we have QC process as in below:

    1. all materials did 100% inspect before sent to workshop
    2. Did at least 48 hours aging test after assemble
    3. Inspect 10% quantity of each order to do hang test
    4. Inspect 5% quantity of each order to do vibration test which equal to express shipping.
    5. Each order will take 3-5 pieces to do environment high temperature test

    Q: About the payment terms?

    Re: Small amount is 100% deposit before production, mass order accept 30% -50% deposit before production, full balance before delivery.


  • Previous:
  • Next: