Led Flat Par Light Manual Manufacturers – 200W COB LED waterproof IP65 par light – Beyond

Short Description:


Product Detail

Related Video

Feedback (2)

We are proud of the superior customer gratification and wide acceptance due to our persistent pursuit of top of the range both of those on merchandise and service for Lighting Clamps, Concert Lights, Night Club Light, It can be our wonderful honor to meet your requires.We sincerely hope we can cooperate along with you inside the around long term.
Led Flat Par Light Manual Manufacturers – 200W COB LED waterproof IP65 par light – Beyond Detail:

200W COB LED waterproof IP65 par light

  • Light source:200W cob led+12x10w RGBW led
  • New type high brightness and light output lens
  • Use 180°reversed big vision colorful LCD display
  • High powrful and good colors
  • IP powercon in/out socket
  • Dimension: 29*28*21.5cm
  • NW:6.5 kgs
  • Good to use on stage or architectural lighting
  • Cental COB led can do white or RGBW
  • Beam angle: 55 degree

未标题-1

Technical Parameters

Optics Construction
Led source 1pcs 200W white & 4-in-1 rgbw COB led + 12pcs 10W RGBW led Display Touch Display
Beam angle COB led 55 degree; RGBW led 25 degree Data In/Out socket waterproof DMX in/out socket
Power Consumption 350W Power Socket Waterproof Powercon in/out
Control  Protection Rating IP65
Control Modes DMX512/Auto Run Specification
DMX mode COB White+RGBW :12/8 Channels  Dimension 282*213*290mm; 
COB RGBW+RGBW:10/14 Channels NW 6.5 kgs
Features Standard package:carton;Flight case in optional
Dimmer:0~100% smooth dimming ;two dimmer model in optional( delay or without delay) Certification:CE,ROHS

LUX Date

2013

Product Effect

未标题-2

Product Test Process

test

There are 6 normal steps for QC control process:
Step 1: all materials passed 100% IQC inspect
Before send materials to workshop and start to produce, our IQC technicians will inspect them.
And only the materials are approved to send to workshop if they are qualified.
All units lights will
Step 2: at least 48 hours aging test before packing
All unit lights will be 100% QC inspect and takes around 48- 72 hours aging test
Step 3: hang testing
Each batch production we will select certain percent to do hang or rotating test
Step 4 : Environment high temperature testing
we did two parts test for high temperature testing :
A: testing during the product still in R & D
B: testing for each batch production
Usually we test the temperature reach to around 45℃
Step 5 : vibration test–simulating transit environment
each batch production we will select certain percent to test to make sure the goods is safe in transport
Step 6: waterproof testing (only for IP65 lights)
all waterproof lights we will do waterproof test to see can it be work fine under rain

Goods Shipping

12


Product detail pictures:

Led Flat Par Light Manual Manufacturers –  200W COB LED waterproof IP65 par light –  Beyond detail pictures

Led Flat Par Light Manual Manufacturers –  200W COB LED waterproof IP65 par light –  Beyond detail pictures

Led Flat Par Light Manual Manufacturers –  200W COB LED waterproof IP65 par light –  Beyond detail pictures

Led Flat Par Light Manual Manufacturers –  200W COB LED waterproof IP65 par light –  Beyond detail pictures


Related Product Guide:

Now we have superior devices. Our solutions are exported to your USA, the UK and so on, enjoying a superb name between customers for Led Flat Par Light Manual Manufacturers – 200W COB LED waterproof IP65 par light – Beyond , The product will supply to all over the world, such as: South Africa, Durban, luzern, Our stock have valued 8 million dollar , you can find the competitive parts within short delivery time. Our company is not only your partner in business, but also our company is your assistant in the coming corporation.
  • We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Jenny from United Arab emirates - 2018.05.22 12:13
    We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
    5 Stars By Hilda from Sheffield - 2018.12.11 14:13